Sign In | Join Free | My ledscreensign.com
China Weifang Shihua Chemical Building Material Co., Ltd. logo
Weifang Shihua Chemical Building Material Co., Ltd.
Weifang Shihua Chemical Building Material Co., Ltd.
Verified Supplier

1 Years

Home > PU Waterproof Coating >

High Elongation PU Waterproof Coating Two Component For Crack Bridging

Weifang Shihua Chemical Building Material Co., Ltd.
Trust Seal
Verified Supplier
Credit Check
Supplier Assessment
Contact Now

High Elongation PU Waterproof Coating Two Component For Crack Bridging

Supply Ability : 1000000kg per Month

Surface Drying Time : ≤12 h under standard condition

Brand Name : shhous

Temperature/Humidity : Construct at 5℃-35℃; low temp slows curing; avoid rainy and dewy days

Model Number : two‑component

Substrate : Substrate must be solid & dry, free of standing water, dust and oil; interface treatment required for damp surface

MOQ : 1000kg

Chemical Resistance : Resistant to water, acid, alkali and salt corrosion

Price : USD 1.3‑1.5/kg

Solid Content : ≥92 %

Packaging Details : Metal Barrel

Through‑curing Time : ≤24 h under standard condition

Certification : ISO

Ventilation : Keep ventilated, avoid inhaling volatile gas, wear protective equipment

Place of Origin : Shandong, China

Application Method : Cold‑applied by troweling or brushing

Contact Now

High-elongation Two-component Polyurethane Coating For Crack-bridging

Advantages for Bathroom

  1. High film elasticity: High tensile strength and elongation, resists thermal expansion‑contraction and micro‑cracks of substrate, prevents water‑leakage caused by floor slight deformation.
  2. Seamless waterproofing: Reactive liquid‑formed film fully covers corners, pipe roots and floor drains without joints, reduces leakage risk at high‑risk positions.
  3. Strong adhesion: Firm bonding to cement‑mortar substrate, less hollowing, blistering and delamination.
  4. Long‑term water immersion resistance: Stable performance under long‑time soaking, ideal for shower area waterproofing.
  5. Mildew & corrosion resistance: Adapt to hot‑humid bathroom environment, resist sewage corrosion.
  6. Excellent water‑pressure resistance: Dense film with strong impermeability to stop water seepage to lower floors.
  7. Good for detail treatment: Extra‑thick coating around pipe roots and floor drains to reinforce high‑leakage‑risk zones.
  8. High mechanical strength: Cured rubber‑like film resists impact, hard to damage during tile‑laying work.
No. Item Precautions
1 Substrate Substrate must be solid & dry, free of standing water, dust and oil; interface treatment required for damp surface
2 Mixing Ratio Weigh A & B strictly by weight ratio; wrong ratio causes uncured sticky or brittle film
3 Stirring Electrically stir 3-5min until uniform; poor mixing causes partial curing failure
4 Pot-life Use up within pot-life after mixing; discard gelled material, do not dilute with water
5 Coating Layers Apply thin multi-coats in cross directions; avoid heavy coat to prevent blistering & sagging
6 Temperature/Humidity Construct at 5℃-35℃; low temp slows curing; avoid rainy and dewy days

Application Method for Bathroom

  1. Substrate preparation: Keep bathroom floor & wall solid and flat. Remove dust, oil and loose mortar. Plug holes and repair cracks. Keep substrate dry without standing water.
  2. Detail reinforcement: Apply 1‑2 coats of two‑component polyurethane as extra layer for pipe roots, floor drains and corners, width ≥250mm per side. Proceed to main‑area construction after drying.
  3. Proportion & mixing: Weigh component A and B strictly by weight ratio. Electrically stir for 3‑5 minutes until uniform without particles. Use mixed material within pot‑life, do not dilute with water.
  4. Multi‑layer trowel application: Apply thin coats repeatedly; single heavy coat is forbidden. Apply next coat after previous coat dries, brush in cross directions. Total film thickness for floor ≥1.5mm; shower‑zone wall height ≥1.8m, other walls ≥300mm.
  5. Curing: Natural full curing. Forbid treading and water contact during curing period.
  6. Water‑storage test: Carry out 24‑48 hours water‑storage test after full curing. Pass test if no leakage downstairs.
  7. Protective layer & tile work: Apply cement‑mortar protective layer after qualified water test, then lay ceramic tiles.

High Elongation PU Waterproof Coating Two Component For Crack Bridging


Product Tags:

high elongation pu waterproof coating

      

pu waterproof coating two component

      

high elongation polyurethane waterproofing coating

      
Quality High Elongation PU Waterproof Coating Two Component For Crack Bridging for sale

High Elongation PU Waterproof Coating Two Component For Crack Bridging Images

Inquiry Cart 0
Send your message to this supplier
 
*From:
*To: Weifang Shihua Chemical Building Material Co., Ltd.
*Subject:
*Message:
Characters Remaining: (0/3000)